MBN-GMBH

  Case     |      2023-02-02 17:22

MBN project:

  • FAW VW Foshan I Chassis assembly line VW316 turnkey design, installation, commissioning,
    standby
  • FAW VW Foshan I Chassis assembly line vision station design, installation, commissioning,
    standby
  • FAW VW Changchun Chassis assembly line design, installation, commissioning, standby
  • FAW Hongqi Fanrong New Energy Chassis assembly line E111/C100 turnkey design, installation,
    commissioning, standby

  • FAW VW Foshan AR-HUD 

  • VW Anhui AR-HUD